The scheduler shows employee availability and jobs on a shared timeline.
Choose the planning view
Open Scheduler.
Move to the relevant date with the previous, today, next, or date controls.
Choose a day, week, or month view and adjust the timeline scale when needed.
Use filters to focus on the relevant departments, employees, resources, job statuses, or other planning information.
The timeline places employees and resources in rows and scheduled work at its planned time. Select or double-click a job to inspect its details.
Schedule and move work
Open the unscheduled jobs panel. Enable jobs without a date when those should be included.
Find the job that needs planning.
Drag it to the correct employee or resource row and time.
Move an existing job to change its time or assignment, or resize it to change the planned duration.
Reopen the job and verify its date, time, employees, resources, and address.
Dragging or resizing changes live planning data. Check the target row and time before dropping the job. Core can reject or warn about changes that conflict with job rules or existing information.
Map mode can be used to compare the planned work with its locations while keeping unscheduled work available below the timeline.